Crafty Baker new store electrical fit-out, Oratia

Crafty Baker

The Conduction Company wired Crafty Baker's new bakery store in Oratia, from bare timber frame to fit-off, over 35 site days. The job ran in monthly stages from June to December 2025.

Dining area under a dark raking ceiling with track lights and white cone pendant lights

The project in numbers

  • 357 scheduled crew hours, TCCO job records
  • 35 site days, June to December 2025, TCCO schedules
  • 6 TCCO team members on the job, TCCO schedules
  • 32 track light heads on 3 tracks, TCCO job records
  • 287 m of Cat6 data cable (approximate), TCCO materials records
  • 28 invoiced jobs for Crafty Baker since January 2024, TCCO records

The brief

Crafty Baker needed the full electrical fit-out for a new bakery store in Oratia, West Auckland. The kitchen equipment list was still being decided as the build went on, so the wiring had to keep pace with a plan that kept moving. The Conduction Company worked the job in monthly stages alongside Crafty Baker's project manager, the builders, and the other trades.

What we did

The Conduction Company pre-wired the store in June 2025, through the open timber frame and under the high raking ceiling. That covered the lighting circuits, the kitchen lighting, the power loops, and 3-phase wiring for the dishwasher and range hood. The team ran sub-mains to a kitchen counter switchboard and fitted off a separate back-bar switchboard.

For the lighting, The Conduction Company installed 3 track lighting systems, two 6 metre tracks and one 8 metre track, carrying 32 track light heads. The team hung 8 pendant lights, 5 Otto and 3 Koni, and fitted 9 LED panel lights (600 x 600) in the kitchen and back-of-house.

The Conduction Company ran 6 data runs and 5 CCTV camera cable runs to a data rack, using about 287 metres of Cat6, and fitted a 6RU data cabinet with a 24-port Cat6 patch panel. The team also installed an intruder alarm kit with a PIR (motion) sensor.

In the kitchen, The Conduction Company bonded the stainless steel benches to earth and fitted a gas emergency stop, three-phase isolators, two three-phase isolating plugs for kitchen equipment, and an oven isolator. The team cabled the fresh air fan, range hood and solenoid, and tested and confirmed them working on 11 December. It also connected the rooftop extraction fan, and fitted 3 hand dryers, an outdoor outlet for the water heater, and a provision for garden lighting.

Photos from the job

Products installed

Voltex outlets and switches, UniLine and Voltex breakers, Otto and Koni pendants, Cat6 data cable and patch panel

Compliance record

The outcome

What the client said

Project value

We quote on facts, not guesses

Before The Conduction Company gives you a price, we carry out a proper assessment of your property and what your project needs. That way you know exactly what you're buying and the total cost, with no surprises. Clear expectations from the outset, start to finish.

Planning something similar?

Talk to The Conduction Company about your project.